Section | Route | Length (Km) | Time (Hr) | Difficulty | Elevation |
---|---|---|---|---|---|
6 | Tai Po Road to Shing Mun | 4.6 | 1.5 | * | - |
Actual Section | Actual Route | Actual Length (Km) | Actual Time (Hr) | Actual Difficulty | Actual Elevation |
6 | Tai Po Road to Shing Mun | 4.6 | 2.0 | * | - |
Route (Section 6):
Tai Po Road > Kowloon Reservoir > Kam Shan > Shing Mun Reservoir
大埔公路 > 九龍水塘 > 金山 > 城門水塘
Description:
Trail Section6 is mainly pedestrian way and road way before reaching Kam Shan. The road climb up the Kam Shan towards BBQ site are made up of rock stairs, and muddy road.
Transportation to Starting Point | Transportation to End Point |
---|---|
KMB Bus 81 - on at Shatin off at Shek Lei Pui Reservoir or KMB Bus 72 | walk from Shing Mun BBQ site towards mini-bus 82 stop |
-
|
No comments:
Post a Comment